Eskom: Rosebank Gridlock not load shedding – it’s “systems failure” (video)

A friend took an hour to drive just over one kilometre this morning as Johannesburg traffic came to a grinding halt. The immediate assumption was Eskom load shedding. Give a dog a bad name and all that…..But this time it’s got nothing to do with the power utility. Soon after I posted this video, Eskom executive director Steve Lennon sent me the tweet below:

Not sure which is worse. A planned shutdown or a failure of the “system” that caused the area to be shut off the grid from 6pm to 9:30pm last night – and then again from a most inconvenient 6am this morning. Oy vey.  – AH

GoHighLevel
gohighlevel gohighlevel login gohighlevel pricing gohighlevel crm gohighlevel api gohighlevel support gohighlevel review gohighlevel logo what is gohighlevel gohighlevel affiliate gohighlevel integrations gohighlevel features gohighlevel app gohighlevel reviews gohighlevel training gohighlevel snapshots gohighlevel zapier app gohighlevel gohighlevel alternatives gohighlevel pricegohighlevel pricing guidegohighlevel api gohighlevel officialgohighlevel plansgohighlevel Funnelsgohighlevel Free Trialgohighlevel SAASgohighlevel Websitesgohighlevel Experts