Mercedes C350e: Plugin hybrid driven and tested
Miles Downard gets behind the wheel of the Mercedes C350e plugin hybrid to discuss the merits of combining petrol and electric power.
Miles Downard gets behind the wheel of the Mercedes C350e plugin hybrid to discuss the merits of combining petrol and electric power.
Never under-estimate the power of human ingenuity. Especially in a rapidly developing field like energy.
Eskom has met the country’s electricity demand while operating its generation fleet in a sustainable manner for over two weeks.
With cash-strapped Russian President Vladimir Putin pushing SA into a R1-trillion nuclear deal that would burden taxpayers for decades, local businesses are growing increasingly restive, looking for ways to share resources and eliminate Eskom from their lives.
“There is currently no load shedding as Eskom has enough generating capacity to meet the demand,” the power utility said in a statement.
Power outages are the biggest brake on South Africa’s economic growth, Finance Minister Nhlanhla Nene said Monday, as factories, homes and offices across the country continue to suffer from long electricity cuts.
Sowetans received a rude awakening on economic realities last Friday when they joined the rest of electricity starved South Africa. Their harsh introduction to load-shedding was a ten hour switch-off.
We had half an hour of load-shedding this morning. As it wasn’t scheduled by Eskom the State-owned monopoly remains on track to break eight consecutive days of rolling blackouts.
Despite blackouts taking place for two days running nationally, South Africa is in “no way close” to a total power blackout, according to a government minister.
“Eskom will implement stage two load shedding from 4pm today, which is likely to continue until 10pm this evening,” the power utility said in a statement.