A Code Red at the hands of Eskom

It was masked as load reduction towards the end of last year but it’s taken Eskom less than two weeks of the new year to bring back load shedding.

And the picture the power utility has painted doesn’t point to a pleasant future.

Despite the local economy stuttering to a Covid halt, the three-month forecast shows Code Red for load shedding every week.

So what happens when the economy gets going again and winter arrives?

Best of the week:

Best read:

Most watched:

Most heard:

GoHighLevel
gohighlevel gohighlevel login gohighlevel pricing gohighlevel crm gohighlevel api gohighlevel support gohighlevel review gohighlevel logo what is gohighlevel gohighlevel affiliate gohighlevel integrations gohighlevel features gohighlevel app gohighlevel reviews gohighlevel training gohighlevel snapshots gohighlevel zapier app gohighlevel gohighlevel alternatives gohighlevel pricegohighlevel pricing guidegohighlevel api gohighlevel officialgohighlevel plansgohighlevel Funnelsgohighlevel Free Trialgohighlevel SAASgohighlevel Websitesgohighlevel Experts